Project 1

Sports Focused Family Living and Entertaining in Easton, PA


This unfinished 2,200 SF basement was designed for family gatherings with a living area, children's play space, bar and wine room, exercise area, ladies lounge, and powder room. It also houses an art gallery to exhibit a large collection of Major League Baseball and Notre Dame sports memorabilia. The basement interiors were to reflect the traditional detailing of the upper floors of the house combined with a more modern vocabulary of today’s casual living style. The scope included custom millwork, humidifier system for the wine room, copper topped bar, stone walls, and specialty moldings.Project budget: $350,000. Project timeline: 6 monthsProject challenge: Sourcing the copper bar work and maintaining a perfect room temperature for multiple days while pouring and curing resin over copper sheeting.
Before Images:

My Role:

  • Performed full project management services including scope of work definition, project budget, and timeline.

  • Performed complete interior design services including space planning, contract documents, and material selections.

  • Hired and managed architect and contracting team.

  • Managed daily construction activities through to Certificate of Occupancy receipt.


Design & Construction Portfolio

Project 2

Kitchen with French Influences in Bethlehem. PA

This kitchen was the first remodel of the original kitchen in a home built in 1929. The home was constructed with French architectural features that the client wished to reflect in her kitchen design. The goal was to bring the kitchen into the 21st century with beautiful custom designed cabinetry, upgraded appliances, and amenities including a spice drawer and pull-out utensil trays. The client also desired a kitchen that reflected the original detailing, was low maintenance, and allowed for a sunny and brighter feeling.

Project budget: $100,000. Project timeline: 3 monthsProject challenge: The first consideration was given to including an exterior vented range hood that did not exist in the original kitchen. The nine foot ceiling allowed for a pair of beams to be constructed into which the vent pipe was fitted and extended to the exterior wall above a window.

Before Images:

My Role:

  • Performed full project management services including scope of work definition, project budget, and timeline.

  • Performed complete interior design services including millwork designs, contract documents, and material selections.

  • Hired and managed contracting team.

  • Managed daily construction activities through to Certificate of Occupancy receipt.

Design & Construction Portfolio

Project 3

Napa Valley Inspired Basement in Center Valley, PA

This partially finished basement was designed and re-constructed to reflect the clients' favorite travel spot, Napa Valley, CA. Stone veneer walls, distressed barn wood beams, and laminate wood flooring were used to create a common theme among different areas of the basement including a wine cellar, sitting area, kitchenette, and exercise area. Careful attention to detail can be seen where painted wood wainscoting meets the stone wall, and at the barn wood screening of the wine room humidifier vent.Project budget: $150,000. Project timeline: 4 monthsProject challenge: Mid-project hurricane Sandy hit the Northeast and damaged a significant portion of the exterior walk-out side of the basement as well as the roof of the home. The framing team was onsite immediately to aid in the clean up and insurance claims. The project was only down for one week plus wait time for the basement French doors.

My Role:

  • Performed full project management services including scope of work definition, project budget, and timeline.

  • Performed complete interior design services including space planning, contract documents, and material selections.

  • Hired and managed contracting team.

  • Managed daily construction activities through to completion.